Filter By:
Installation Instructions
How to Install a Weir Box
While Weir Boxes eliminate many of the typical installation considerations of Weir Plates, some considerations have to be taken into account when installing a Weir Box.
Installing the Weir BOX
- The Weir Box must be mounted so that the weir plate is level from front-to-back and from side-to-side.
- The mounting surface of the weir box should be sufficiently consolidated that it will not shift or move out of position due to settlement, frost heave, etc.
- The weir crest must be horizontally level.
- If present, the bevel of the weir crest must be set downstream.
- In earthen channel applications, the channel downstream of the Weir Box should be reinforced / armored so that scour does not occur. Scouring can lead to the Weir Box shifting out of position.
- Water Measurement with Flumes and Weirs (ISBN 90-70754-55-X) provides details of channel reinforcement, however as a rule of thumb protection should extend at least 4 Hmax downstream (and not less than 5-feet [1.5 m].
LOCATIONS IN ATLANTA, GA & BOISE, ID