Where to Install a Weir Channel
Proper site selection is vital to the success or failure of any weir channel installation. The need for a sizeable upstream weir pool and a drop after the weir can make it challenging to find just the right site.
Upstream of the Weir Channel (Weir Pool Sizing)
- Without flow condition, the channel upstream of the weir should be straight and of a uniform cross-section for at least 20 times the maximum anticipated head (Hmax).
- For applications where an underflow baffle is placed upstream of the weir, the approach conditions can be eliminated.
- Here the underflow baffle is usually place 1-2 Hmax upstream of the point of measurement.
- The flow approaching the weir should be smooth, tranquil, and well distributed across the channel.
- The upstream channel should be clear of vegetative growth.
- For earthen channel installations, the sidewalls and weir pool floor should be consolidated so that flow does not bypass the weir.
- Flow approaching the weir must be sub-critical and should not exceed 0.5 ft/s [0.15 m/s].
- If the flow is super-critical approaching the flume a hydraulic jump must be formed well upstream of the flume or upstream energy absorbers and tranquilizing racks must be used).
-
Should a hydraulic jump need to be formed to slow the flow, it should be forced to occur at least 30 Ha upstream of the flume.
Weir Channel Location
- The crest (flow edge) of the weir in the Weir Channel must be able to be set 2-3 times Hmax above the floor of the channel.
- The crest of the weir must be able to be set at least 2-inches [5.08 cm] above the maximum downstream water level.
- This distance should extend at least 20 times Hmax (per Weir Pool Sizing above).
- The weir must be able to be set level from side-to-side and from front-to-back.
- Weirs must be able to be set horizontally / vertically level and centered in the channel.
Downstream of the Weir Channel
- The downstream channel should be armored (riprap) or otherwise protected so that scour does not occur.
- The downstream channel must be clear of vegetative growth or the collection of debris so that flow.